Numbers we stand behind.

96%

Supplier on-time delivery

Up from 72% in 12 months, across a 200+ supplier aerospace and defense base.

8%

Lower material cost

Year-end 2025, while tariffs and geopolitical pressure drove double-digit material and manufacturing cost increases.

1‑3 wks

Component lead time

Down from 8 to 12 weeks, through an S&OP process built with Sales.

Sagemore's founder delivered these results while running supply chain organizations between 2017 and 2026. They are operator results, not client results. See the results

Aircraft, ships, and freight.

Military fighter jet taxiing on an airfield
Defense aircraft programs
Navy amphibious assault ship docked at a pier
Naval platforms
Loaded container ship at sea
Global freight
Precision metal shaft being machined in a CNC lathe

On the floor and with your suppliers.

  • Honest. We tell you what the numbers show, including what you may not want to hear.
  • Transparent. You see the data, the assumptions, and the supplier conversations.
  • Detailed. Every recommendation comes with an owner, a date, and a target.

More about us

Start with a 30‑minute conversation.

Tell us what you buy and where the problem is. We will tell you what we would look at first.

Start a conversation