Supply chain consulting for industrial manufacturers.
Industrial manufacturers feel supply chain problems in material cost, lead time, and cash in inventory. We work inside your team on all of them. The aim is lower purchased material cost and shorter component lead times, with inventory brought down without starving production.
- 8%lower material cost at year-end 2025, while tariffs drove double-digit material and manufacturing cost increases
- 1 to 3 weekscomponent lead times, down from 8 to 12 weeks, through S&OP built with Sales
- 32%lower days inventory outstanding through material planning programs
From our operating experience. Not client results.
The habits that cost margin and cash.
Spend bought one order at a time
Buyers place orders as requirements drop. Nobody sources the category, so price moves with every quote and tariffs land without a plan.
Lead time treated as one number
A component lead time is made of order placement, material, queue, process, and transit. Each part can be shortened a different way.
Excess and shortages in the same warehouse
Planning settings were loaded once and never reviewed. Slow parts pile up while high-use parts run out.
Growth ahead of the process
Revenue grows faster than the supply chain team, its procedures, and its tools. Each buyer works a different way.
What we do for industrial manufacturers.
8 items
| Problem | What we do | Service |
|---|---|---|
| Material cost keeps rising | Spend analysis by category, sourcing events, and agreements with suppliers that can hold price. | Strategic procurement |
| Prices are not locked in | Long-term agreements and fixed-frame contracts for categories such as fabrication, machining, welding, hardware, and seals and gaskets. | Strategic sourcing and long-term agreements |
| Tariffs and long transit times | U.S. sources found, qualified, and compared on landed cost. | Domestic supplier sourcing |
| Too many suppliers | Suppliers scored on delivery, quality, cost, and capacity, then spend moved to fewer, stronger suppliers by category. | Supplier base consolidation |
| Lead times are too long | A monthly S&OP cycle built with Sales, so real demand reaches suppliers earlier. | Integrated planning and S&OP |
| Too much cash in inventory | A DIO baseline, ABC/XYZ planning, safety stock and min/max resets, and supplier stocking agreements. | Inventory and DIO reduction |
| Freight cost is unmanaged | Lane analysis, carrier RFQs, and rate agreements for domestic and international freight. | Freight and logistics agreements |
| Quotes take too long | Make or buy analysis and quoting tools that standardize supply chain inputs to proposals. | Make/buy and quoting tools |
What you receive.
6 deliverables
- Spend cube by category, supplier, and part family
- Category strategies and long-term agreements for your highest-spend categories
- S&OP process design with roles and calendar
- Safety stock and min/max settings ready to load into your ERP
- Supplier scorecards and a review cadence your team runs
- Standard operating procedures with ERP steps
Standards, contracts, and systems we have worked within
- S&OP
- MRP
- ABC/XYZ analysis
- Total cost of ownership
- LTA
- Fixed-frame contract
- ISO 9001
- 6S
- Infor LN
- Shoptech E2
- Fishbowl
From operating experience.
- 8% lower material cost at year-end 2025, while tariffs and geopolitical pressure drove double-digit manufacturing and material cost increases.
- Component lead times cut from 8 to 12 weeks down to 1 to 3 weeks through an S&OP process built with Sales.
- 32% lower days inventory outstanding through material planning programs that freed working capital and improved cash flow.
- 27% lower cost, $225K saved, by onboarding the first U.S. key supplier for a high-volume commodity group.
- Supply chain infrastructure scaled to support 40% year-over-year growth while executing a 30,000 sq ft facility expansion.
- Internal quoting lead time cut from 72 to 24 hours with make/buy, quoting, and estimating tools.
These results were delivered while running supply chain organizations between 2017 and 2026. They are operator results, not client results. See all results
Three ways to work together.
3 items
| Type | What it is | What you receive |
|---|---|---|
| Assessment | A fixed-scope review of spend, suppliers, inventory, and contracts. | A baseline and a ranked list of opportunities. |
| Project | One defined outcome, such as a sourcing event, a long-term agreement program, or an S&OP rollout. | Signed agreements or a working process, measured against the target. |
| Continual requirement | Recurring supplier reviews, contract management, planning support, and process audits. | Scorecards, audit results, and actions each period. |
Manufacturing supply chain questions.
Do you work with manufacturers outside aerospace and defense?
Yes. Our experience includes leading North American procurement, logistics, warehousing, and inventory operations for a global manufacturer from 2022 to 2026, with an 18-person team and $19M in annual supplier spend.
Can material cost come down while tariffs and market prices are rising?
It can. See the result under strategic procurement.
Will lower inventory hurt on-time delivery?
It should not when levels are set part by part. See inventory and DIO reduction.
Do we need new software for S&OP?
No. In our view, the process comes first. See integrated planning and S&OP.
Which ERP systems do you know?
We have worked directly in Infor LN, Shoptech E2, and Fishbowl. We can work from a standard export of other systems.
Do you work with small manufacturers?
Yes, and that is the scale we know. Our experience comes from supply chain teams of 12 to 18 people and up to $19M in annual supplier spend.
Not ready to talk? Start here.
Use these on your own. No form to fill in.
- Self-check: your supply chain in ten questionsYour score shows on screen, with where to look first.
- Tool: FAR and DFARS flow-down matrix19 clauses you can filter, with a spreadsheet to download.
- Guide: FAR and DFARS flow-down clausesWhat flows down, when, and what the supplier must do.
- Guide: what a supply chain consultant costsFee models, what drives the cost, and when to hire one.
Start with a 30‑minute conversation.
Tell us which one is moving the wrong way: material cost, lead time, or inventory. On the call, we will tell you what we would look at first.
Supply chain, procurement, and contract management services for aerospace, defense, and industrial manufacturers, for a single project or a continual requirement.
Start a conversation